io.scanbimlabs/acc-mcp · v1.0.0 · productivity
ACC MCP is healthy: it completed an MCP handshake in 522 ms and exposes 9 tools.
Autodesk Construction Cloud via APS — projects, issues, RFIs, documents, submittals.
Endpoint: https://acc-mcp.itmartin24.workers.dev/mcp (streamable-http)
No repository listed · JSON · Add to my inventory
| Users (last 30 days) | 0 |
| Handshake | Healthy |
| Auth needed | None |
| Tool count | 9 |
| Latency | 522 ms |
| Last checked (UTC) | 2026-10-15T11:50:08.837Z |
| Checked (UTC) | Status | Latency | Error |
|---|---|---|---|
| 2026-10-15T11:50:08.837Z | Healthy | 522 |
acc_list_projects | Enumerate every ACC and BIM 360 project the authenticated APS app can see by walking all accessible hubs and their project lists. When to use: The agent needs to discover project IDs before calling any other tool (e.g. the user says 'show me my projects' or 'find issues in the Tower project' and no |
acc_create_issue | Create a new ACC issue (field observation, coordination clash, safety, quality, etc.) in the target project via the APS Construction Issues API. When to use: The user wants to log a new issue — e.g. 'open a high-priority issue about the leaking valve on level 3' or a downstream agent detected a def |
acc_update_issue | Patch an existing ACC issue — change status, priority, assignee, or description via the APS Construction Issues API. When to use: The user asks to close/reopen/escalate an issue, reassign it, or edit its body. Typical agent flow: acc_list_issues → pick an id → acc_update_issue. When NOT to use: Do |
acc_list_issues | List and filter issues from a single ACC project (limit 50 per call) via the APS Construction Issues API. When to use: The user or upstream agent needs to review open issues, count issues by status/priority, or look up an issue_id before calling acc_update_issue. E.g. 'show me all critical open iss |
acc_create_rfi | Create a new Request For Information (RFI) in an ACC project via the APS Construction RFIs API. RFI is created in 'draft' status — the project workflow owner typically transitions it to 'submitted'. When to use: The user needs a formal question-of-record to the design or GC team — e.g. 'raise an RF |
acc_list_rfis | List and filter RFIs from a single ACC project (limit 50 per call) via the APS Construction RFIs API. When to use: The user wants to review open RFIs, count outstanding ones, or look up an RFI ID. E.g. 'how many RFIs are still open on the Tower project?' When NOT to use: Do not use for issues (use |
acc_search_documents | Full-text search the ACC Docs repository of a project for drawings, specs, submittals, and other files via the APS Data Management search endpoint. When to use: The user wants to find a document by keyword (filename, sheet number, or metadata match). E.g. 'find the latest A-201 sheet' or 'search fo |
acc_upload_file | Upload a file from a public source URL into an ACC project folder. Runs the full four-step APS Data Management flow: top-folder discovery → storage object creation → OSS PUT of bytes → first-version item creation. When to use: The user wants to push a document/photo/model into ACC Docs — e.g. 'uplo |
acc_project_summary | Fetch the full ACC project metadata record (name, type, status, dates, extension attributes) for a single project via APS Data Management. If hub_id is omitted the tool picks the first accessible hub, which may be wrong on multi-hub tenants. When to use: The user asks 'tell me about project X' or a |