Agile Today

org.agile-today/agile-today · v2.3.2 · ecommerce

Agile Today is healthy: it completed an MCP handshake in 2429 ms and exposes 8 tools.

Project management methodology graph: route planning, stage-gate decisions and plan checks.

Endpoint: https://agile-today.org/api/mcp?src=mcp-registry (streamable-http)

No repository listed · Website · JSON · Add to my inventory

Facts

Users (last 30 days)0
HandshakeHealthy
Auth neededNone
Tool count8
Latency2429 ms
Last checked (UTC)2026-10-16T19:30:44.969Z

Health history

Checked (UTC)StatusLatencyError
2026-10-16T19:30:44.969ZHealthy2429
2026-10-15T13:00:17.475ZHealthy1544

Tools (8)

list_contextCall first. Returns the context dimensions and flags (with defaults and how many rules each flag drives), stages, gates, evidence states and levels, the gate outcome precedence and the suggested workflow.
plan_projectRoute from presale to closure for a project context. Default is compact (ids by strength + a names dictionary, core items and gate evidence for all stages, about 6–10k characters). Ask for one stage with stages:['st.design'] and format:'full' for reasons, avoid texts and gate details. 'core' = do it
check_gateEvaluates gate g.g0 … g.g10 against your evidence. Outcome precedence: Stop > Recycle > Hold > Conditional go > Go, with the rule that fired (outcome_reason). Critical evidence missing or stale → Hold; required non-critical missing, or a waiver without a reason or an approver who decides at this gat
when_to_useFor one event, practice, technique, notation, tool, artifact or antipattern: does it fit this context (fits / avoid / not_applicable / antipattern), its strength and why, alternatives and their group advice, risks, and which gates require it.
check_mixFor a set of ids: antipatterns in the set and detected by rules, conflicts, redundant alternatives (e.g. seven estimation methods), items to avoid or not applicable here, risks, missing inputs and suggested additions. ok = no antipatterns, conflicts, avoid or not-applicable items; a detected pattern
validate_planChecks an ordered list of steps (stages, gates, events, practices, techniques, notations, artifacts). Errors: empty plan, unknown ids, non-step types, stage order (analysis and design work planned early is only a warning 'early'; building before G3–G5 is an order error), contract after delivery gate
search_graphSearch names, ids, descriptions and aliases in English and Russian (word stems, small typos tolerated). Returns total and the best matches.
explain_nodeOne node with its description, conditions, source, level and its links grouped by type, each with a link id (Lxxxx) to cite. Filter with link_types, direction and limit.