LandBNG

uk.landbng/landbng · v1.0.0 · finance-and-payments

LandBNG is healthy: it completed an MCP handshake in 382 ms and exposes 4 tools.

BNG income and cost estimates for land in England, GB grid headroom and planning history

Endpoint: https://landbng.uk/mcp (streamable-http)

No repository listed · Website · JSON · Add to my inventory

Facts

Users (last 30 days)0
HandshakeHealthy
Auth neededNone
Tool count4
Latency382 ms
Last checked (UTC)2026-10-27T00:15:08.466Z

Health history

Checked (UTC)StatusLatencyError
2026-10-27T00:15:08.466ZHealthy382

Tools (4)

check_grid_connectionCheck nearest UK electricity Distribution Network Operator (DNO) grid connection headroom for a location — generation/demand headroom (MW/MVA), RAG status, voltage, and a combined BNG+grid siting signal. Covers all of Great Britain (England/Scotland/Wales), not just England. Free, no key.
check_planning_historyFind planning applications near a UK location, via UK PlanIt's public aggregator (over 400 UK planning authorities). Free, no key. radius_km must be between 0.1 and 5.0.
estimate_bng_incomeEstimate 30-year lump-sum BNG income (LOW/MID/HIGH) for dedicating `area_ha` hectares of an England parcel to biodiversity net gain habitat creation, from LandBNG planning assumptions per habitat capped at the Defra statutory credit price; local factors (flood zone, SSSI, Green Belt, NSIP demand, An
estimate_bng_costEstimate the cost of meeting England's mandatory 10% biodiversity net gain requirement for a development scheme of `scheme_ha` hectares, across 3 procurement routes (off-site habitat bank mosaic, off-site grassland/ heathland, statutory biodiversity credits, priced per unit at two Defra credits per